PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Verizon Removing the lines at Cherry St (800x600).jpg Verizon truck at Cherry St (800x600).jpg Verizon Working on removing the light poles Facing East (800x600).jpg Cutting beam pockets at Stair -4 3rd floor Facing South-East (800x600).jpg Installing conduit for temporary power Facing South (800x600).jpg Installing Derrick -3 Facing West (800x600).jpg Installing layout for the wall forms at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Under Derrick -3 Facing North (800x600).jpg
Previous pageNext page Installing conduit for temporary power Facing South (800x600)
Installing conduit for temporary power Facing South (800x600)